The FNN Guideline describes requirements and verifications for generation plants, continuously controllable storage systems and consumption equipment to ensure partial grid operability including overfrequency regulation in the event of major disturbances. These can be achieved with control measures and can only be requested fully in the event of rare disturbance events. This does not place additional demands on the generation plant during normal operation.